zauhar
Veteran
I think that is Soup to Fix total times...HC110 B
4.5m Dev. at 20c, 1m stop, 5m fix
-------------------------------------------------------------------
My Workflow:
- 5-10 minutes to set up, includes loading a roll in a bag, 10-15min develop though Fix, (HC110 B),
- 20 minutes wash, I get 4 changes of charcoal filtered water per minute,
- 1.5 minutes Photo-Flo (1.5mL per 300mL),
- 1.5hrs dry. If I am in a hurry, I will use a hair dryer on the cooler setting after 30m of air dry -- for 5min I guess. (Still warm air).
Ah, that makes sense.
Randy