timeUnit
Established
Hi!
In the datasheet for Neopan 1600 the dev. time for NP 1600@ISO 1600 in 20°C is a mere 4,5 minutes. This seems very short to me. Rated @ ISO 3200 the datasheet says 10 minutes, more than twice the time. Could the ISO 1600 time be a misprint? Has anyone tried NP1600 in T-Max developer?
Thanks.
In the datasheet for Neopan 1600 the dev. time for NP 1600@ISO 1600 in 20°C is a mere 4,5 minutes. This seems very short to me. Rated @ ISO 3200 the datasheet says 10 minutes, more than twice the time. Could the ISO 1600 time be a misprint? Has anyone tried NP1600 in T-Max developer?
Thanks.