Hi there.
I'm learning to develop my own BW films. But, i'm getting some inconsistent results.
Since I dont know where the problem is, I ask for your help.
I'm using the following products:
Developer: RODINAL
Fixer: AGEFIX
Stop Bath: Kodak
And AGEPON.
I use all the chemical in the recomended dilution.
For the processes, i do the following:
I make all the dilutions, put them for an hour in a bath of tap water. Then i get the temperature of the developer and process as recomended (usualy i use the times/dilutions found in The Massive Dev Chart).
Assuming that the times i get is, for example, 13m @ 20Cº/68Fº, i use an chart obtained in Ilford Web Site (i think) and do 10m30s for 22Cº/72Fº.
Then i start the clock and start to pour the developer in the tank. I use a tank for 2 35mm rols, but i dilute the enough for one roll. I't taker about 40s to fill the tank.
During the developing time i do the recomeded inversions, like 5 inversions each 1m.
When the time is up, i pour off the developer and pour in the stop bath for usualy 5 minuts.
Then I save the stop bath and pour the fixer, for 15 minuts.
After saving the fixer, i then do the wash.
For washing, i fill the tank with the tap water and do 3x20 inversions and 3x30 inversions (changing the water each time).
After that i put the Agepon for 5 minuts, and hang the film for about 3 hours in dust free enviroment.
So ... is there anything i'm doing wrong?
I welcome all inputs 🙂
I'm learning to develop my own BW films. But, i'm getting some inconsistent results.
Since I dont know where the problem is, I ask for your help.
I'm using the following products:
Developer: RODINAL
Fixer: AGEFIX
Stop Bath: Kodak
And AGEPON.
I use all the chemical in the recomended dilution.
For the processes, i do the following:
I make all the dilutions, put them for an hour in a bath of tap water. Then i get the temperature of the developer and process as recomended (usualy i use the times/dilutions found in The Massive Dev Chart).
Assuming that the times i get is, for example, 13m @ 20Cº/68Fº, i use an chart obtained in Ilford Web Site (i think) and do 10m30s for 22Cº/72Fº.
Then i start the clock and start to pour the developer in the tank. I use a tank for 2 35mm rols, but i dilute the enough for one roll. I't taker about 40s to fill the tank.
During the developing time i do the recomeded inversions, like 5 inversions each 1m.
When the time is up, i pour off the developer and pour in the stop bath for usualy 5 minuts.
Then I save the stop bath and pour the fixer, for 15 minuts.
After saving the fixer, i then do the wash.
For washing, i fill the tank with the tap water and do 3x20 inversions and 3x30 inversions (changing the water each time).
After that i put the Agepon for 5 minuts, and hang the film for about 3 hours in dust free enviroment.
So ... is there anything i'm doing wrong?