Nokton48
Veteran
Darkroom Renovation Phase 2 No 1 by Nokton48, on FlickrStarting with Phase 2 of this project. I have a contractor doing the work for me, I can input ideas and he runs with them and sometimes makes my ideas even better.
Adding new drainage, New inputs with two more sink units, my green Kreonite, and a 3D printed yellow plastic water factory containment unit, meant to hold two 55 gallon drums filled with oil or chemicals. Installing a drain and putting my 16x20 fibre print washer in there.
A lot of progress on this will happen today.
This area will be for film development, film and print washing and drying. To the right is the entrance to the Darkroom Phase I you can see here:
https://www.rangefinderforum.com/forums/showthread.php?t=167410&highlight=darkroom+renovation











