Jonik
Member
Greetings,
right now i've got about 5 exposed films in the fridge waiting for 3 more to get exposed and then developed all together..
it's gonna be stand developing for all of them and i was wondering if i can get 5 of them in a single x5 35mm tank and the rest in a single x3 35mm tank and be done with it in a couple of hours..
is there a limitation when using this method, like for example 2 films at a time ?
the tank is quite tall so maybe the developer will tend to go towards the bottom of the tank or something like that(maybe it's heavier than the water or i dunno..), leaving the films in the top reels undeveloped/unevenly developed?
Edit: i'm gonna be using 0.5ml HC 110 +2 ml R09 in 300 ml water per film
right now i've got about 5 exposed films in the fridge waiting for 3 more to get exposed and then developed all together..
it's gonna be stand developing for all of them and i was wondering if i can get 5 of them in a single x5 35mm tank and the rest in a single x3 35mm tank and be done with it in a couple of hours..
is there a limitation when using this method, like for example 2 films at a time ?
the tank is quite tall so maybe the developer will tend to go towards the bottom of the tank or something like that(maybe it's heavier than the water or i dunno..), leaving the films in the top reels undeveloped/unevenly developed?
Edit: i'm gonna be using 0.5ml HC 110 +2 ml R09 in 300 ml water per film