Dwayneb9584
Well-known
Hey all,
So I've accumulated all of the things I need in order to process my film thanks to my girlfriends awesome Christmas gift from B&H. I'm going to process the 10 rolls of film I shot since I just bought my rangefinder about three months ago. Just wanted some quick help.
I have a double reel SS tank with Hewes HD reels developing in Ilford Ilfotec DD-X, Fixing in Ilford Rapid Fixer, and using a Kodak Photo-flo 200 as my wetting agent. Now I wanted to know as for the Stop bath, how long do I do this for since I'm using water? I am developing Ilford HP5 Plus 400 speed 35mm film.
To my knowledge from what I've read and researched.
I will be doing...
Developer 12 min with 4 inversions every minutes until 12minutes is up (correct me if I'm wrong).
Stop bath (Water) How long, how many inversions?
Fixer 3 minutes 3 inversions once every minute.
Wash Cycle:
Cool temperature water, fill up 3 times
1st fill 5 inversions
2nd fill 10 inversions
3rd fill 20 inversions
Final Wash Cycle:
Add wetting agent with a few inversions.
DONE
Please feel free to correct me if I am wrong with anything. I am having trouble with the stop bath section. What temperature should my water be for this? or do I skip this section and just add the fix to it. I plan on developing tonight. All help greatly appreciated.
Dwayne
So I've accumulated all of the things I need in order to process my film thanks to my girlfriends awesome Christmas gift from B&H. I'm going to process the 10 rolls of film I shot since I just bought my rangefinder about three months ago. Just wanted some quick help.
I have a double reel SS tank with Hewes HD reels developing in Ilford Ilfotec DD-X, Fixing in Ilford Rapid Fixer, and using a Kodak Photo-flo 200 as my wetting agent. Now I wanted to know as for the Stop bath, how long do I do this for since I'm using water? I am developing Ilford HP5 Plus 400 speed 35mm film.
To my knowledge from what I've read and researched.
I will be doing...
Developer 12 min with 4 inversions every minutes until 12minutes is up (correct me if I'm wrong).
Stop bath (Water) How long, how many inversions?
Fixer 3 minutes 3 inversions once every minute.
Wash Cycle:
Cool temperature water, fill up 3 times
1st fill 5 inversions
2nd fill 10 inversions
3rd fill 20 inversions
Final Wash Cycle:
Add wetting agent with a few inversions.
DONE
Please feel free to correct me if I am wrong with anything. I am having trouble with the stop bath section. What temperature should my water be for this? or do I skip this section and just add the fix to it. I plan on developing tonight. All help greatly appreciated.
Dwayne