I bought a fully working M3 in "tip top mechanical condition" except that when it arrived, the finder patch was very dim, the framelines were stuck and the shutter wasn't fully opening at about 1/2 the speeds. It went off the CRR to confirm the faults and a quote for the "resolution process". This took nearly 2 months and had to be finalized before I could give them the OK to go ahead. Then it went in the wait where normally you would still be using the camera. Take all that out and it comes down to 2-3 months. I don't know what it is now but the last time I made ebquiries, the waiting list for Shintaro was over a year and CRR is in the same country.
Kim
Kim
Crasis said:6 months? Jeez. How long is Shintaros wait? 2 years?