R
ruben
Guest
Since long time ago I am happily processing Neopan 1600 with Tmax Developer at 4and half minutes for 20 centigrades temperature.
But due to the hot temperatures now I need to process at 24 centigrades and I have no written trial time to base myself
I would appreciate if anybody using both Tmax dev and Neopan 1600 could give me the percentage of time reduction when using the combination at 24 centigrades.
Thanks in advance,
Ruben
But due to the hot temperatures now I need to process at 24 centigrades and I have no written trial time to base myself
I would appreciate if anybody using both Tmax dev and Neopan 1600 could give me the percentage of time reduction when using the combination at 24 centigrades.
Thanks in advance,
Ruben