newfilm
Well-known
Hi guys! I'm currently got myself a roll of RPX 100 and attempt to trying out pushing it 2 stops at 400.
Massive Dev charts says for pushing 1 stop with D-76:1+1 at EI 100 is 11 minutes, EI 200 is 15 minutes, unfortuneatly it din't says anything about at EI 400, but if I were to guess, does that mean pushing 2 stops with the same dilution at EI 400 would be 18 minutes dev time?
Many thanks!
Massive Dev charts says for pushing 1 stop with D-76:1+1 at EI 100 is 11 minutes, EI 200 is 15 minutes, unfortuneatly it din't says anything about at EI 400, but if I were to guess, does that mean pushing 2 stops with the same dilution at EI 400 would be 18 minutes dev time?
Many thanks!