Doug A
Well-known
The ABLON takes up almost no room and is very rugged. I don't carry it in my camera bag because I would also have to carry the utility knife I use with it, and that would take up quite a bit of room in my little bag. Not to mention the trouble when flying. What I do instead is pre-cut the leaders on all of my film when I buy it in factory-loaded cartridges or bulk load it in FILCA cassettes.Does an ABLON (or knockoff) travel well in a camera bag? Or is it something that is only used at home, and not taken along on trips?