I think I will finish the wall to the right of the door, there is room to spare to put the six foot long Delta darkroom sink there. Electricals already in there (to a point), water lines already run just on the other side of the same wall, also the Kreonite Water Board is right there, just needs to be flipped into the new work space. And the Kreonite CPT16 drain line is right there too. I think this is the easiest way to get the new long sink up and running. Next to the new sink on the white concrete wall will go the 4x4 foot Kreonite Plate Washing Sink, and the Calumet 16x20 Archival Print Washer.
Plenty to consider this weekend. Start again on Monday.