Tuesday we start on installing the drop ceiling.
Also installing the vent unit (had to special order that), for the hot air pipe running through the darkroom ceiling. Should make it comfortable in there. One section of pipe hangs low and we will leave that exposed, below the finished drop ceiling. Permanently installed my big miter saw to the Harbor Freight Heavy Duty Miter Table. Ready to cut some 2x4s......
All wood will be cut in the garage, and pre drilled with pilot holes right after cutting, with my mini drill press. Then screwed together down in the darkroom. My shop vac has a new filter so we are good to go. After the ceiling is complete, we build the work tables to go under the sinks. And redoing electrics and new plumbing into the new space, that will requiring some thought regarding best placement.
Bought a Bondo fiberglass patching kit, and Bondo resin (for underside of sink), to restore my 4x4 foot Kreonite green sink. That we will do outside.................
Trying to keep costs down, but not cut ANY corners.
Also installing the vent unit (had to special order that), for the hot air pipe running through the darkroom ceiling. Should make it comfortable in there. One section of pipe hangs low and we will leave that exposed, below the finished drop ceiling. Permanently installed my big miter saw to the Harbor Freight Heavy Duty Miter Table. Ready to cut some 2x4s......
All wood will be cut in the garage, and pre drilled with pilot holes right after cutting, with my mini drill press. Then screwed together down in the darkroom. My shop vac has a new filter so we are good to go. After the ceiling is complete, we build the work tables to go under the sinks. And redoing electrics and new plumbing into the new space, that will requiring some thought regarding best placement.
Bought a Bondo fiberglass patching kit, and Bondo resin (for underside of sink), to restore my 4x4 foot Kreonite green sink. That we will do outside.................
Trying to keep costs down, but not cut ANY corners.